
Hotpoint
Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey
Best price incl. delivery
£498.95
£479.00 + £19.95 delivery
Prices range from £479.00 to £499.00 across 3 stores
Sonicdirect.co.uk+£19.95 delivery
3 stores
BrandHotpoint
EAN5054645719464
Compare prices
About this product
Hotpoint C HD 94M GBS UK. Appliance placement: Freestanding, Loading type: Front-load, Drying system: Heat pump. Rated capacity: 9 kg, Condensation efficiency class (old): A, Condensation efficiency class: B. Delay start (max): 24 h, Apps supported: HomeWhiz. Energy efficiency class: C, Energy consumption: 1.06 kWh, Annual energy consumption: 194 kWh. Hotpoint technologies (clothes care): Easy empty filter, Fabric Care, FastDry, PetHairCare, Rapid option
Specifications
Power
Current10 A
Heat sourceElectric
Connected load1325 W
Power plug typeType G
Energy consumption1.06 kWh
Energy efficiency classC
Energy efficiency scaleA+++ to D
Power consumption (off)0.47 W
Annual energy consumption194 kWh
Energy efficiency index (EEI)57.6
Design
Door hingeRight
Cord length1.5 m
Control typeButtons,Rotary
Loading typeFront-load
Drum materialStainless steel
Drying systemHeat pump
Product colourDark grey
Built-in displayY
Reversible doorsN
Appliance placementFreestanding (placement)
Inverter technologyN
Ergonomics
BuzzerY
Child lockY
Self-cleaningN
Apps supportedHomeWhiz
Adjustable feetY
Delay start (max)24 h
Delayed start timerY
Drum interior lightY
Water level indicatorY
Filter cleaning indicatorY
Remaining time indicationY
Water tank full indicatorY
LED program stage indicatorY
Price History (Last 30 Days)
Lowest Price Ever
£469.00
Ao.com · 5 May 2026
Highest Price
£549.00
Ao.com · 30 Apr 2026
Recent Price Changes
Ao.com·6 May
£469.00→£519.00↑£50.00
Ao.com·3 May
£549.00→£469.00↓£80.00
Ao.com·30 Apr
£519.00→£549.00↑£30.00
Frequently Asked Questions
What is the cheapest price for Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey?
The cheapest price for Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey is £498.95 (including delivery) from Sonicdirect.co.uk.
How many stores sell Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey?
We compare prices from 3 different UK stores to help you find the best deal for Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey.
What is the price range for Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey?
Prices for Hotpoint C HD 84M Wbs UK 8 kg Heat Pump Tumble Dryer - White, Silver/Grey range from £479.00 to £499.00 across different retailers.
Independent price comparison·Prices updated regularly
CodeLand may earn commission from purchases made through our links, at no extra cost to you.


